Outline

East building

 

Building Outline

Name NAKANO CENTRAL PARK EAST
Address Nakano 4-10-1, Nakano-ku, Tokyo, 164-0001 JAPAN
Building use Office/Shop/Parking
Site area 6,045 ㎡ (1,828 tsubo)
Building area 3,851 ㎡ (1,164 tsubo)
Total floor area 39,025㎡ (11,805 tsubo)
Scale 2F underground, 10F above ground, 1F penthouse
Structure Above ground: Steel (CFT column), Underground: SRC, RC
Maximum height Seismic Isolated Structure
50.60 m
Parking lot 84
(Surface parking lot:31 Machine parking: 53)
* Excludes 2 handicapped bays and 6 delivery bays.
Developer TMK Nakano Station Area Development
Design Toda Corporation first‒class registered architect office
Construction Toda Corporation
Completion March,2012

 

Leasing Outline

Total office leasing are 24,4432 ㎡ (7,390 tsubo)
Leasing floor area 2F: 2,183㎡ (660 tsubo)
10F: 2,614㎡ (790 tsubo)
Standard floor (3 to 10F): 2,804㎡ (848tsubo)
Ceiling height 2,900mm
Possible partition Partionable up to 4 zones
*Partitionable to 3 zones maximum for 2F
OA floor H=150mm
*H=300mm for 2F
Floor load-bearing capacity Standard zone: 500kg/㎡
Heavy duty zone: 1,000kg/㎡
*2F: 1,000kg/㎡
(limited within rooms for rent)
OA outlet capacity 70VA/㎡ (possible to enlarge)
Telecommunication equipment Wiring roots for future installation are provided from MDF to rooms for rent.
Ceiling and lighting equipment 600mm×600mm Grid ceiling system
Auto dimming system
Air-conditioning Air handling unit VAV system
Extra space for future enlargement is provided.
Others Capable to install exclusive stairs
Capable to install staff dinning room (10F)
Heavy duty floor (2F)

 

Equipment Outline

Electric substation Ultra-high-voltage substation facilities 22kV
Spot network electricity distribution system
Emergency power generator Emergency power generator for the building
Space is provided for tenant's private emergency power generator. (Diesel type 500kVA×2)
Oil tank [concurrent use with building]30,000l×1 is mounted
Common antenna television system BS, 110°CS digital terrestrial broadcasting(UHF), FM antenna installed
Security Access control system by non-contact IC card
Interlocked with automatic shut off of air-conditioning and lighting, as well as non-stop control of elevator
Sanitary equipment Restroom: 1 per floor
Powder corner in women's restroom
Universal restroom: 1per floor
Hot-water service room: 2 per floor
Elevator Passenger: 8
Emergency / cargo: 2
Parking lot: 1

Top^^


 

South building

 

Architectural outline

Name NAKANO CENTRAL PARK SOUTH
Address Nakano 4-10-2, Nakano-ku, Tokyo, 164-001 JAPAN
Building use Office/Shop/ Hall/Conference room/ Parking
Site area 23,835 ㎡ (7,210 tsubo)
Building area 8,924㎡ (2,699 tsubo)
Total floor area 151,577㎡ (45,852 tsubo)
Scale 1F underground, 22F above ground, (including penthouse)
Structure Above ground: Steel (CFT column), Underground: SRC, RC
Damping Structure
Maximum height 99.95 m
Parking lot 297
(Surface parking lot:9 Machine parking: 288)
* Excludes 3 handicapped bays and 10 delivery bays.
Developer TMK Nakano Station Area Development
Design Kajima Corporation first‒class registered architect office
Construction Kajima Corporation
Compretion May,2012

 

Leasing Outline

Total office leasing are 98,044 ㎡ (29,658 tsubo)
* Leasable rooms within core are excluded.
Leasing floor area 2F(Utillity Office) : 2,027㎡ (613 tsubo)
Standard floor (3 to 21F) : 5,053㎡ (1,528tsubo)
* Leasable rooms within core are excluded.
Ceiling height 2,900mm
* 2F(Utillity Office) : 3,200mm
Possible partition Partitionable to 5 zones (Partitionable up to 8 zones at maximum)
OA floor H=150mm
* H=300mm for 3F
Floor load-bearing capacity Standard zone: 500kg/㎡
Heavy duty zone: 1,000kg/㎡
* 3F : 1,000kg/㎡ (limited within rooms for rent)
OA outlet capacity 70VA/㎡ (possible to enlarge)
Telecommunication equipment Wiring roots for future installation are provided from MDF to rooms for rent.
Ceiling and lighting equipment 600mm×600mm Grid ceiling system
Auto dimming system
Air-conditioning Air handling unit VAV system
Extra space for future enlargement is provided.
Others Utillity Office (2F)
Capable to install exclusive stairs
Capable to install staff dinning room (3 to 21F)
Heavy duty floor (3F)

 

Equipment Outline

Electric substation installation Ultra-high-voltage substation facilities 22kV
Spot network electricity distribution system
Emergency power generator Emergency power generator for the building
Space is provided for tenant's private emergency power generator.(Gas turbine type 1,500kVA x 2)
Oil tank 45,000ℓ×2 are mounted
Common antenna television system BS, 110°CS digital terrestrial broadcasting(UHF), FM antenna installed
Security Access control system by non -contact IC card
Interlocked with automatic shut off of air-conditioning and lighting, as well
as non-stop control of elevator
Sanitary equipment Restroom: 2 per floor
Powder corner in women's restroom
Universal restroom: 1per floor
Hot-water service room: 2 per floor
Elevator Passenger : 30
EV bank for lower floors (3 to 8F):7
EV bank for low and middle floors (8 to 13F):8
EV bank for middle and upper floors (13 to 18F):8
EV bank for upper floors (18 to 21F):7
Emergency / cargo: 3
Parking lot : 1
Service space for shops:1
Convention :1